Panama’s Copa Airlines has cut four destinations from its network and again pushed back fleet growth plans due to a shortage of new jets from Boeing.
“Due to Boeing delivery delays, the arrival of our last two aircraft of the year was postponed by a few months,” Copa chief executive Pedro Heilbron said on 21 November during the airline’s third-quarter earnings call. “We are temporarily pulling out of four markets… The reason we are doing that is also tied to aircraft deliveries.”
The delivery delays come as no surprise, as Boeing’s 737 production was shut down for nearly eight weeks until early November due to a machinists’ strike. The strike was among several production disruptions that kept Boeing from hitting its delivery targets this year.
As an all-737 operator, Copa’s ability to achieve its business objectives depends heavily on the success of the US manufacturer.
Heilbron says Copa received one 737 Max 8 – its first of the type – from Boeing during the third quarter and that it ended the period with 110 jets in its fleet, including the single Max 8, 32 737 Max 9s, 67 737-800s, nine 737-700s and one 737-800 Freighter.
Heilbron expects Copa will receive another two jets – both Max 8s – from Boeing before year end. An updated schedule from Boeing calls for Copa to receive another 11 Max 8s in 2025. If Boeing makes good on that schedule, Copa expects it will end next year with 123 jets in its fleet.
But the plan is far from certain. “This delivery schedule has production ramp up assumptions that will need to materialise, so actual aircraft deliveries could change,” Heilbron says.
He adds that aircraft shortages recently prompted Copa to stop flying to four destinations: Tulum International in Mexico, Felipe Angeles International near Mexico City, Armenia in Colombia and Santiago de los Caballeros in the Dominican Republic.
“We should be back before the end of 2025,” Heilbron says of those airports.
Fleet troubles aside, Copa turned a $146 million profit in the third quarter, down 22% year on year, with $855 million in operating revenue, down 1.5% from its revenue in the third quarter last year.
The company’s third-quarter results were also impacted by halting flights this year to Venezuela, reportedly due to diplomatic tension and domestic-Venezuelan unrest. Those flights have not yet resumed.
Panama’s Copa Airlines has cut four destinations from its network and again pushed back fleet growth plans due to a shortage of new jets from Boeing.
“Due to Boeing delivery delays, the arrival of our last two aircraft of the year was postponed by a few months,” Copa chief executive Pedro Heilbron said on 21 November during the airline’s third-quarter earnings call. “We are temporarily pulling out of four markets… The reason we are doing that is also tied to aircraft deliveries.”
The delivery delays come as no surprise, as Boeing’s 737 production was shut down for nearly eight weeks until early November due to a machinists’ strike. The strike was among several production disruptions that kept Boeing from hitting its delivery targets this year.
As an all-737 operator, Copa’s ability to achieve its business objectives depends heavily on the success of the US manufacturer.
Heilbron says Copa received one 737 Max 8 – its first of the type – from Boeing during the third quarter and that it ended the period with 110 jets in its fleet, including the single Max 8, 32 737 Max 9s, 67 737-800s, nine 737-700s and one 737-800 Freighter.
Heilbron expects Copa will receive another two jets – both Max 8s – from Boeing before year end. An updated schedule from Boeing calls for Copa to receive another 11 Max 8s in 2025. If Boeing makes good on that schedule, Copa expects it will end next year with 123 jets in its fleet.
But the plan is far from certain. “This delivery schedule has production ramp up assumptions that will need to materialise, so actual aircraft deliveries could change,” Heilbron says.
He adds that aircraft shortages recently prompted Copa to stop flying to four destinations: Tulum International in Mexico, Felipe Angeles International near Mexico City, Armenia in Colombia and Santiago de los Caballeros in the Dominican Republic.
“We should be back before the end of 2025,” Heilbron says of those airports.
Fleet troubles aside, Copa turned a $146 million profit in the third quarter, down 22% year on year, with $855 million in operating revenue, down 1.5% from its revenue in the third quarter last year.
The company’s third-quarter results were also impacted by halting flights this year to Venezuela, reportedly due to diplomatic tension and domestic-Venezuelan unrest. Those flights have not yet resumed.
Source link
Share This:
admin
Plan the perfect NYC Memorial Day weekend
Pack only what you need and avoid overpacking to streamline the check-in and security screening…
LA’s worst traffic areas and how to avoid them
Consider using alternative routes, such as Sepulveda Boulevard, which runs parallel to the 405 in…
L3Harris secures G550 electronic attack contract for Italian air force | News
L3Harris Technologies has received a $300 million contract for a programme to supply Italy with…
RC-135 Rivet Joint platform remains best in the business, L3Harris official says | News
Decades after first entering service, the Boeing RC-135V/W Rivet Joint remains a critical electronic intelligence-gathering capability…
U-2S high-altitude spyplane makes rare public display at UK air show | News
Two of the US Air Force’s (USAF’s) distinctive high-altitude spyplanes made a rare public appearance…
US manufacturers target European market with uncrewed fighter aircraft as USAF prototypes near first flights
American manufacturers developing the first generation of uncrewed fighter aircraft see big potential in Europe.…
NMH win ‘critical’ for Yeovil but opportunities exist for AW159 and AW101, says Leonardo Helicopters UK chief | In depth
The new boss of Leonardo Helicopters UK has stressed the “criticality” for the business of…
Airbus, Kratos pitch unmanned Valkyrie for German air force use | News
Airbus Defence & Space and Kratos Defense and Security Solutions have joined up to pitch…
Global temporarily parks A380 at Tarbes to await further maintenance
UK company Global Airlines has transferred its Airbus A380 to Tarbes airport in France, but…
Aegean brings forward Indian route expansion with A321XLR acquisition
Greek carrier Aegean is to acquire a pair of long-range Airbus A321XLR which will enable…
UK reveals design of its next-generation combat air flying demonstrator | News
A first image has been released depicting the UK’s combat air flying demonstrator, as component…
Warsaw’s secondary airport will be first in Poland to have remote digital tower
Warsaw’s secondary Modlin airport is to be equipped with a digital control tower which will…