Flight-tests beckon for a Yakovlev Yak-40 which has been fitted with the VK-800 engine intended for the UZGA LMS-901 Baikal and LMS-192 Osvey.

The Yak-40 testbed has been modified at the Siberian aviation research institute SibNIA.

“Installation and commissioning of the VK-800 engine have been completed,” the institute says. “The next stage that lies ahead is a test flight.”

Origins of the VK-800 date back some two decades. It was originally developed by Klimov, with the aim of using it to power helicopters.

While this project became dormant, UZGA revived the engine’s development from 2019 and final factory testing began in 2023.

Yak-40 engine test-c-UZGA

It says the engine can deliver 807-877hp (601-653kW) depending on requirements.

Along with the Osvey and Baikal, the powerplant is intended for the UTS-800 trainer and the re-engining of L-410 regional airliners.

UZGA has been using General Electric H80 engines to support aircraft programmes while the VK-800 is under development.





Source link

Posted in
Uncategorized
Related Posts
Limousine Comments are Closed

Plan the perfect NYC Memorial Day weekend

Pack only what you need and avoid overpacking to streamline the check-in and security screening…

News Comments are Closed

LA’s worst traffic areas and how to avoid them

Consider using alternative routes, such as Sepulveda Boulevard, which runs parallel to the 405 in…

Leonardo Helicopters’ Proteus technology demonstrator poised to make first flight for UK Royal Navy

Leonardo Helicopters has edged a step closer to flying its AW09-based Proteus technology demonstrator for…

Brazil test fires MBDA Meteor missiles from Gripen E fighter in major milestone

Brazil has notched a major milestone in its campaign to phase in Saab’s latest Gripen…

Aeroflot Group discloses acquisition of 747 and 737 freighters

Aeroflot Group has disclosed that eight aircraft – including freighters – have been introduced to…

Airbus cuts full-year delivery target by 30 aircraft

Airbus has cut its full-year delivery target to 790 commercial aircraft, down from the original…

Hi Fly claims Antarctic first with A330 follow-up to A340 landing

Portuguese wet-lease specialist Hi Fly has flown an Airbus A330-300 to Antarctica, claiming a first…

Austria to field 12-strong Leonardo M-346FA fleet from 2028 under $1.75 billion deal

Austria has finalised a roughly €1.5 billion ($1.75 billion) deal that will lead to its…

Avincis and DHC partner on CL-series waterbomber support

Aerial services provider Avincis is to collaborate with De Havilland Canada (DHC) on a series…

MBDA Meteor missile integration nears flight-test phase with Lockheed Martin’s stealthy F-35A

MBDA’s Meteor beyond-visual-range air-to-air missile has moved a step closer to commencing flight trials with…

Jekta hydrogen-electric amphibian aircraft scale model testing begins January 2024

Swiss start-up Jekta plans next month to begin flight testing a scale model of the…

Sikorsky S-92 engine failure caused by maintenance lapse, Norwegian investigators find

Norwegian investigators believe an unspecified maintenance issue was the likely cause of an in-flight engine…

Post a comment

Your email address will not be published.